Disulphide Separator Replacement


An EPC Project taken by one of our major clients “Govind Development, LLC." It was Revamp Project of a refinery to replace the Disulphide Separator and its associated equipment and electrical & instrumentation

  • Preparation of Single Line Drawings, Cable routing, cable schedule and Junction Box drawings.
  • Checking of P&IDs with Pipe Specifications.
  • Isometric drawing checking with P&IDs and specifications.
  • Mechanical Drawings checking with vessel and columns.
  • Equipment data sheet checking as per Design Basis.
  • Junction box drawing, Single Line Diagram (SLD), cable tray drawings and Loop Drawings.

Process

GDL India takes complete detail engineering of process plant based on Basic Design Package


Read More

Mechanical

GDL India possesses experience and expertise in design engineering of Mechanical Equipment.


Read More

Electrical & Instrumentation

In Electrical & Instrumentation engineering, we undertake typical detail engineering documents and tasks which include


Read More

Piping

Conceptual Plot Plan for the project starts with the Piping Design activities.Layout of equipment items,


Read More

Project Management

We make a team of people to handle the project. This essentially have lead Design engineer,...


Read More