Disulphide Separator Replacement
An EPC Project taken by one of our major clients “Govind Development, LLC." It was Revamp Project of a refinery to replace the Disulphide Separator and its associated equipment and electrical & instrumentation
- Preparation of Single Line Drawings, Cable routing, cable schedule and Junction Box drawings.
- Checking of P&IDs with Pipe Specifications.
- Isometric drawing checking with P&IDs and specifications.
- Mechanical Drawings checking with vessel and columns.
- Equipment data sheet checking as per Design Basis.
- Junction box drawing, Single Line Diagram (SLD), cable tray drawings and Loop Drawings.