EF90, LLC Waste Water Treatment Project
The initial phase will consist of two process trains, with expandability for a third process train in the future. Wastewater generated in them desalters, along with oily stormwater from equipment platforms, will require collection and treatment prior to discharge. The final effluent location and permit requirements have not been fully established, but preliminary design conditions have been established based on initial information for the refinery units) and from similar discharge permits for surrounding industries. Waste Water treatment plant of 100GPM capacity at Corpus Christi, Texas Terminal Operations. Wastewater generated in the desalter, along with oily storm water from equipment platforms. The detail scope as below:
- QA-QC of Basic and Detail Engineering Documents and Drawings including the Basis of Design Report.
- Checking of P&IDs with respect to Basis of Design Report, Process Line List, Process Valve List and Instrumentation List.
- Line Hydraulics and Pump Hydraulics Calculations checking.
- Equipment data sheet checking as per Design Basis.
- Piping Layout checking with respect to Hydraulic Calculations.
- Instrument Data Sheet checking with respect to P&ID.